Home Projects Gallery Contact us Vacancies Links
THE POINT - PADDINGTON Projects -> The Point - Paddington

 

Project: The Point - Paddington

Year Completed:
2002

Building Address:
The Point, Paddington Basin, North Wharf Road, London

Building Type:
Commercial

Architect:
Terry Farrell & Partners

Contractor:
Bovis Lend Lease

Curtain Walling:
Felix (UK) Ltd

System: 10 Storey Corporate Headquarters building for Orange Mobile Phones. The ground and lower ground levels have full height glazing, recessed behind polished concrete columns. The two curved facades above this, from levels 1 - 6, comprise full height glazing behind a frame of vertical metal fins. Between these fins on the south-side, is a system of timber bris-soliel, providing effective solar control to the office space. The upper three floors are a ‘smooth skin’ climate facade in contrast to the more modeled lower floors. The east elevation is a simple composition of two towers, of the same glazing system addressing the adjacent plaza.

Photograper: Peter Durant
Project:
Bracken House

Year: 1991

Building Type: Office Block
Project:
Montevetro

Year: 1991

Building Type: Residential

home | projects | gallery | contact us| clients | links
2006 SN Murdoch ltd. Site by CityLytes